Baratang Island in June
Andaman & Nicobar Islands, India
Baratang in June is the day-trip closed by infrastructure. The Andaman Trunk Road through the Jarawa Reserve has 3-4 chronic landslide stretches that close repeatedly through the monsoon - the route is shut for 6-24 hours at a time. Creek boats from Nilambur are off the water on most days as the creeks run brown and fast with mangrove runoff. The limestone cave floor floods to ankle depth in heavy rain, making the back chamber inaccessible. The mud volcano viewing platform is fine in the rare break of weather but the road in is broken. Tour operators in Port Blair stop selling Baratang packages from June 1 to October 15.
Why June scores 2.0/10
Weather
Monsoon. ATR closes for landslides routinely. Creek boats off, cave access flooded. Skip.
Who should go
- ✓Travelers with basic fitness
Who should think twice
- ✗Those with mobility issues
- ✗Families with young children
- ✗All standard visitors
All 12 Months
| Month | Score | Note |
|---|---|---|
| January | 10.0/10 | Peak. 22-29C, dry. Convoy reliable, mud volcano + caves running. 4am Port Blair start required. |
| February | 10.0/10 | Driest, calmest. 23-30C. Cave boat ride glass-flat. Convoy on schedule. Best month for Baratang. |
| March | 8.0/10 | Late peak. 25-31C. Cave dry, mud volcano stable, creek boat calm. Day-trip prices 20% off Feb. |
| April | 8.0/10 | Hot 27-32C. Cave still dry, creek boat calm. ATR convoy on schedule. Big heat at the mud volcano. |
| May | 6.0/10 | Pre-monsoon. First half OK. After May 18 squalls cancel creek boats and ATR closes for landslides. |
| Juneviewing | 2.0/10 | Monsoon. ATR closes for landslides routinely. Creek boats off, cave access flooded. Skip. |
| July | 2.0/10 | Peak monsoon. ATR closed routinely. All headline activities off. Skip. |
| August | 2.0/10 | Monsoon continues. 460mm rain. ATR broken, boats off, cave flooded. Skip entirely. |
| September | 4.0/10 | Late monsoon. 320mm rain. ATR repairs ongoing. Creek boats not yet running. Operators shut. |
| October | 6.0/10 | Recovery. 180mm rain. ATR reopens mid-month, creek boats restart late. Last week works. |
| November | 8.0/10 | Properly open. 60mm rain, 23-30C. Convoy on schedule, creek boats daily, cave dry, mud volcano firm. |
| December | 10.0/10 | Peak. 22-29C, dry. Convoy reliable, cave dry, creek glass-flat. Christmas-NY 40% premium. |
ठहरने की बुकिंग के लिए तैयार हैं?
हम बुकिंग से पहले आते हैं, उसके साथ नहीं — नीचे दिए प्लेटफ़ॉर्म पर दाम की तुलना करें।
किसी भी जगह, ठहरने या ऑपरेटर को दिखाने के लिए हम पैसे नहीं लेते। यहाँ दिए किसी लिंक से बुकिंग करने पर हमें थोड़ा कमीशन मिल सकता है, आप पर कोई अतिरिक्त खर्च नहीं। इससे हमारे स्कोर या सुझावों पर कभी असर नहीं पड़ता। संपादकीय नीति
अगले Baratang Island के लिए तैयार रहें
रविवार को एक ईमेल — कौन सी जगह अगले हफ़्ते जाने लायक है। साथ ही जो जगहें आप सहेजें, उनके पीक से तीन हफ़्ते पहले हेड्स-अप। बिना स्पैम।
Free. No sponsored picks. Unsubscribe in one click.