North Bay Island in August
Andaman & Nicobar Islands, India
Skip — small-boat access from Port Blair restricted in monsoon swells; sea-walk and snorkeling operators close. Better window: November–April.
August at North Bay is July with marginally fewer wet days. Rainfall settles to 410-440mm, but the operator picture is unchanged: sea-walk, scuba, glass-bottom are all closed for the season. The Phoenix Bay sailings that exist are inter-island ferry traffic to Havelock and Neil running on rough-sea curtailed timetables - none stop at North Bay. Even on the calm days that occur three or four times in the month, the reef has visibility of 6-10m and operators have sent staff home for the season. The 20-minute crossing is genuinely dangerous in monsoon swell - smaller boats with low gunnels do not handle it. The next reliable open window is November. August is a non-trip.
Why August scores 2.0/10
Weather
Monsoon continues. 420mm rain. All operators still closed. Crossings unsafe. Skip.
Who should go
- ✓First-time travelers
- ✓Senior citizens
- ✓Families with children
Who should think twice
- ✗Most travellers
All 12 Months
| Month | Score | Note |
|---|---|---|
| January | 10.0/10 | Peak. 24-29C, vis 25-30m. Glass-bottom and sea-walk daily. Boats fill 8-10am. |
| February | 10.0/10 | Driest month. 25-30C. Vis 30m. Sea-walk visibility maxes. Quieter post-Valentines weekday. |
| March | 8.0/10 | Late peak. 26-32C, vis 25-28m. Boats on schedule. PB hotel rates back 25 percent below January. |
| April | 8.0/10 | Hot 28-33C. Vis 22-25m. Boats on schedule, hotel rates 35 percent off January. Off-peak with full operations. |
| May | 8.0/10 | Last clean window. 28-33C. Vis 18-22m. Boats run first 18 days reliably. Squalls in last week. |
| June | 2.0/10 | Southwest monsoon. 450mm rain, rough seas. Phoenix Bay sailings cancel daily. Skip. |
| July | 2.0/10 | Peak monsoon. 500mm rain. All operators closed. Sailings suspended most weeks. Skip. |
| Augustviewing | 2.0/10 | Monsoon continues. 420mm rain. All operators still closed. Crossings unsafe. Skip. |
| September | 4.0/10 | Late monsoon. 270mm rain. Operators reopen last week. Vis 12-15m. Sailings still 30 percent cancellation rate. |
| October | 8.0/10 | Season opens. 130mm rain mostly first week. Vis recovers to 20-25m. Operators full menu by mid-month. |
| November | 8.0/10 | Strong shoulder. 60mm rain. 23-30C. Vis 25m. Diwali week packed. Otherwise smooth. |
| December | 10.0/10 | Peak. 23-29C. Vis 28-30m. Christmas-NY 50 percent premium. Sea-walk slots gone by 8:30am. |
ठहरने की बुकिंग के लिए तैयार हैं?
हम बुकिंग से पहले आते हैं, उसके साथ नहीं — नीचे दिए प्लेटफ़ॉर्म पर दाम की तुलना करें।
किसी भी जगह, ठहरने या ऑपरेटर को दिखाने के लिए हम पैसे नहीं लेते। यहाँ दिए किसी लिंक से बुकिंग करने पर हमें थोड़ा कमीशन मिल सकता है, आप पर कोई अतिरिक्त खर्च नहीं। इससे हमारे स्कोर या सुझावों पर कभी असर नहीं पड़ता। संपादकीय नीति
अगले North Bay Island के लिए तैयार रहें
रविवार को एक ईमेल — कौन सी जगह अगले हफ़्ते जाने लायक है। साथ ही जो जगहें आप सहेजें, उनके पीक से तीन हफ़्ते पहले हेड्स-अप। बिना स्पैम।
Free. No sponsored picks. Unsubscribe in one click.